Focused upgrade
Target a defined part of the property while retaining suitable existing elements.
- Typical focus
- A specific room, finish or system
- What to resolve
- Condition of retained work and installation interfaces
Understand what shapes the cost of renovation & design before comparing proposals. Every final quotation follows the property, measured scope and agreed specification.
Target a defined part of the property while retaining suitable existing elements.
Coordinate a full room, property or commercial space as a connected project.
Develop a tailored design with custom details and specialist coordination.
A square-metre or square-foot rate is only useful when it identifies the measured area, specification and inclusions. It cannot replace a review of your actual property.
We do not publish a generic starting price as a substitute for a project scope. Share your working budget and priorities so the proposal can be developed around useful choices.
Price the same work before comparing totals. The following information helps connect your Fitworks brief to an itemised proposal.
Confirm substrate condition, transitions, thresholds and the suitability of each finish for its actual exposure.
Include the ongoing requirement: Keep spare material references and a cleaning guide for each finish.
Review internal layouts, hardware, ventilation and access to adjacent services before fabrication.
Include the ongoing requirement: Record hinge and runner models so adjustments and replacement are straightforward.
Coordinate fittings, switching, dimming, access panels and the control interface with the room plan.
Include the ongoing requirement: Keep circuit information, product schedules and the operating instructions together.
Website concepts and general guidance are not quotations. Scope, product choices, applicable charges and commercial terms belong in the written proposal.
Practical answers for your renovation & design brief.
Browse all common questionsTell us what you have in mind. Start a conversation or send a written project brief.
Send a project enquiry